How it works
Pavers = area / ((paver length + joint) x (paver width + joint)) x (1 + waste). Use 5 % waste for straight laying and 10 % for diagonal patterns or many cuts.
Base gravel = area x base depth, at about 2.0 tonnes per m³ compacted. Bedding sand = area x bedding depth, at about 1.6 tonnes per m³. Joint sand is roughly 4 kg per m².
Edge restraint = perimeter of the rectangle = 2 x (length + width). Leave out the sides that are held by a wall or a house.
Results are estimates for planning. Check product data sheets, local building rules and an engineer's calculations where required.
Frequently asked questions
How deep should the base be under pavers?
About 100 to 150 mm compacted base for patios and paths, and 200 to 300 mm for driveways, plus 30 to 40 mm of bedding sand.
How wide should the joints be?
Concrete block pavers often have 2 to 5 mm joints, many have spacers built in. Large slabs and natural stone usually get 5 to 10 mm.
Do I need edge restraints?
Yes, unless the paving meets a wall or kerb. Without a restraint, the pavers slowly spread out at the edges.